Complex with extensive infrastructure

Complex with extensive infrastructure, прев. 0
Complex with extensive infrastructure, прев. 1
Complex with extensive infrastructure, прев. 2
Complex with extensive infrastructure, прев. 3
Complex with extensive infrastructure, прев. 4
Complex with extensive infrastructure, прев. 5
Complex with extensive infrastructure, прев. 6
Complex with extensive infrastructure, прев. 7
Complex with extensive infrastructure, прев. 8
Complex with extensive infrastructure, прев. 9
Complex with extensive infrastructure, прев. 10
Complex with extensive infrastructure, прев. 11
Complex with extensive infrastructure, прев. 12
Complex with extensive infrastructure, прев. 13
Complex with extensive infrastructure, прев. 14
Complex with extensive infrastructure, прев. 15
Complex with extensive infrastructure, прев. 16
Complex with extensive infrastructure, прев. 17
Object ID 100098 
City, district Alanya, Tosmur 
Property type Flat, Duplex 
Number of rooms 1+1, 2+1, 4+1 
Distance to the sea 250 m
Square 58...231 m²
Year of construction 2024 
from €225 500

Object Infrastructure

Fitness Center
Green Garden
Children's swimming pool
Outdoor swimming pool
Turkish bath
Playground
Wireless Internet
Video surveillance system 24\7
Indoor swimming pool
Massage rooms
Playroom
Gazebos for relaxation
Security
Tennis court
Lounge
Steam room
Cinema
Generator
Billiards
Sauna
Outdoor parking

Three blocks were built in accordance with European standards, according to modern technologies using high quality materials. Land area: 6678 m2. All apartments are rented in a fine finish.

Characteristics of apartments: Ceiling height 3 m; Steel front door, high-quality lacquered interior doors; The walls are painted with washable paint; Windows with double glazing and aluminum profile; Floor covering - porcelain stoneware / ceramic tiles; Kitchen set made of veneered MDF with granite countertop; Quality plumbing; Fully equipped bathrooms with showers; Electric floor heating in bathrooms; Connection for installation of a heating system; Video intercom, sockets for internet and IP TV; External blocks of conditioners are taken out in technical rooms at an end face of the building; "Smart Home" system as standard; Additional water filtration system for residential complex.

Construction will begin in autumn 2022.

Completion of construction is planned in 28 months.

Share:

print:

Get full information about the object